Wilshire & Geary: Two Streets and Two Subway Projects

Like many other things, California was the birthplace of modern rail transit in the United States. BART in the San Francisco Bay Area was the first complete, publicly built, rapid transit system in the United States and represented a paradigm shift in the mentality of transit planners. BART ran from the Outer East Bay (Fremont and Concord) to San Francisco and Oakland’s Downtowns. The line to San Francisco is a branch, and the system is rooted in Oakland. This stands in stark contrast to the New York City Subway or Chicago L, which serve the center city extensively and end in the inner suburbs. These cities have heavy rail, diesel commuter systems which use existing freight tracks without grade separation.

The Bay Area got BART instead of a traditional commuter rail system because of politics. President Lyndon B. Johnson was supporting his Great Society idea, injecting a large amount of public spending for grand, shiny projects like heavy rail systems. Diesel locomotives, or even traditional electric locomotives used on the Northeast Corridor, simply were not as cool. Now, the problem when the “cool” factor gets into transit planning is cost. BART continues to expand at the insane cost of 200+ million dollars per mile. More significantly, BART is the only heavy rail (subway) technology that is feasible to build in Northern California due potential to connect to the current network. BART’s trains are over 700 feet long, with far too many seats and too few doors for urban service.

Los Angeles has a heavy rail service also, but it is entirely different than BART. Los Angeles’ Subway, the Red and Purple Lines, only serve the City of Los Angeles and they travel the most dense areas in all of Los Angeles County. This distinction is easy to see in ridership per mile, where Los Angeles has about 9,000 riders per mile, while BART has 4,000. Train lengths in the LA Subway are 450 feet, and cars have three doors and far fewer seats than a BART train. This is the type of true subway both Los Angeles and San Francisco Need.

The purpose of this article is to compare and contrast two streets in two big, dense cities, that both need heavy rail subway lines under them. Also, I will go into the reasons why one of these subways will be built in the next ten years, and the other won’t.

These two streets are Geary and Wilshire Boulevards in San Francisco and Los Angeles, respectively. Both streets carry the two busiest bus lines in the United States, the 38-38L in San Francisco and the 20-720-920 in Los Angeles. These lines carry over 60,000 passengers a day, a huge amount for a bus line. Metro cannot physically run more buses on Wilshire during peak hour because of intense bunching. Both of these transportation corridors are East-West with parallel bus service also carrying over 100,000 passengers a day on the 1-2-5-31 in San Francisco and the 2-4-14-16-316-704-714 in Los Angeles. Obviously transit demand in these corridors is huge.

The legacy of BART and the Red Line have dictated the progress on high capacity transit alternatives on Wilshire and Geary. Both Metro and SFMTA are implementing exclusive bus lanes on these streets. In neither situation are exclusive lanes sufficient. Underground, high frequency, heavy rail transit is sorely needed in both situations. Since Los Angeles began with a legitimate urban subway system, instead of a suburb-centric heavy rail system, extension along Wilshire Boulevard is (relatively) cheap and feasible. Under Measure R’s schedule, the Westside Subway Extension will reach Westwood by 2036, although with the 30/10 plan, the entire project may be complete 15 years earlier.

This situation leaves us with Geary Boulevard in desperate need of heavy rail transit. The organization of the BART District, with equal power shared across Alameda, Contra Costa and San Francisco Counties, essentially requires equal geographic distribution of BART dollars and extensions. When Contra Costa County got the extension from Concord to Pittsburg/Bay Point, Alameda County got the extension from Bay Fair to Dublin/Pleasanton. San Francisco essentially gained nothing during this time, but that is due to Proposition K, San Francisco’s transportation sales tax, not including any funding for BART extensions. In a new round of extending BART, Alameda County is getting the Warm Springs Extension, and potentially BART to Livermore, while Contra Costa County is getting eBART. Again, San Francisco County is doing its own thing with the Central Subway, Van Ness and Geary BRT and the Transbay Transit Center Program receiving the bulk of the funding.

The essence of the issue with a Geary Boulevard subway is it requires a New Transbay Tube, a mega project on the scale of East Side Access and Access to the Region’s Core Projects in New York City, with a cost that could exceed 6 billion dollars. The issue for BART and the Bay Area is finding a sustainable funding model for this huge project, in my opinion a three way split between San Francisco, Alameda and Contra Costa, so that San Francisco has a platform on which to build its new heavy rail service to the Richmond District.

Maybe, after enough pushing, BART will become more of an urban network, with higher stop frequency in Oakland, Berkeley and San Francisco, and large transit villages outside the urban core.

About Karl Tingwald

Civil engineering student at the University of Southern California with a severe transportation compulsion.

Posted on September 14, 2010, in bamta, Los Angeles, Measure R, Metro Rail, San Francisco Bay Area, Westside Subway Extension and tagged , , , , , , , , , . Bookmark the permalink. 5 Comments.

  1. Like many other things, California was the birthplace of the Swayze movement.

  2. thats how I was hoping this article would begin. Instead it turned out to be about subways. Yawn.

    ….Kidding!

  3. that’s my bus in the pic! Depending on the time of day you ride it, it is the 38 Limited, Express or regular, or if it is saturday night, it is called the Dirty-Eight.

    Nice blog Karl.

  4. Has anyone ever done a study of what it will actually cost to install a Geary subway line + additional tube? What is the cost of the tunner boring method per mile and are we sure that this method is more expensive for BART vs. other tunnels? I’m having a hard time understanding why.

  5. Nice blog. Enjoy reading others thoughts and looking at the maps. Now back to Geary. First off, San Francisco loves to hate Muni, but on the other hand, they are the ones that have the power in building rail. The 1989 tax called for Muni to build rail in 4 corridors. The reason they went to 3rd St first was because the Geary Nimby is so strong they didn’t want to fight it. For the same reason the Geary BRT has languished. I doubt that we will see any kind of rail on Geary in my lifetime (hoping for 40 more years.)

    Edward